Spec-Driven Coding • Prospective & Retrospective Validation

    The Verification Layer for AI-Assisted Codebases

    Documentation drifts. Audit prep takes weeks. Developer context gets lost. SDC keeps your code and compliance in perfect sync.

    terminal
    $ sdc export all
    ✓ Exporting requirements...
    ✓ Exporting features...
    ✓ Exporting design documentation...
    ✓ Exporting tests...
    ✓ Exporting user guides...
    Export complete. 5 documents generated (4.2s)
    FDA 21 CFR Part 11GAMP 5IEC 62304SOXDO-178C

    Built for Two Worlds

    SDC bridges the gap between development velocity and regulatory compliance.

    For Engineering Teams

    Ship faster without losing context

    • Documentation That Keeps Pace

      AI drafts the docs as your code evolves; you review and merge—no more drift between docs and reality.

    • AI Context Injection

      Up-to-date specs injected into every AI prompt for consistent context.

    • Instant Onboarding

      New team members understand the 'why' behind every function in minutes.

    For Regulated Teams

    Audit-ready from day one

    • Traceability You Approve

      AI proposes the Requirement → Feature → Design → Test links; an engineer confirms each one.

    • Audit-Ready Documentation

      Every change linked, timestamped, and export-ready for inspectors.

    From 3-Week Scramble to 5-Second Actions

    See how SDC transforms your compliance workflow.

    Transformation 1
    Before

    Weeks of manual documentation

    After

    Bootstrap mode: 100k+ LOC in hours

    Transformation 2
    Before

    Documentation drift after every sprint

    After

    Incremental mode: Only changed files

    Transformation 3
    Before

    Requirements siloed in spreadsheets

    After

    AI-proposed links: Reqs → Features → Tests, human-confirmed

    Transformation 4
    Before

    Manual test case writing

    After

    Generated protocols with steps

    See SDC in Action

    SDC offers two powerful interfaces: a CLI for developers and CI/CD integration, and a Web Application for team oversight and non-technical stakeholders.

    Project Dashboard

    Project Dashboard

    Complete overview of your compliance status, requirements coverage, and recent activity.

    Code Index

    Code Index

    Complete class-level overview with design topics, methods, summaries, and documentation status at a glance.

    Topics & Designs

    Topics & Designs

    AI-powered topic discovery and clustering of classes into logical design domains with confidence scoring.

    User Guides

    User Guides

    AI-drafted documentation you review, kept in sync with your codebase.

    Meet the SDC Engine

    A team of specialized AI agents that draft the heavy lifting. Every output is reviewed and signed off by a human before it counts.

    Requirements Analyst Agent

    Analyzes user intent and generates structured requirements from natural language inputs.

    Test Protocol Agent

    Generates comprehensive, ready-to-use manual test protocols from feature specifications. Customizable for SOTA automated test applications.

    Documentation Agent

    Drafts topic-specific documentation and bootstraps a first-pass system overview from codebase analysis—for human review.

    Human-in-the-Loop Guarantee

    Every AI-generated artifact is reviewed and approved by expert consultants before delivery.

    Two Ways to Document

    Whether you're starting fresh or inheriting legacy code, SDC adapts to your situation.

    Prospective Mode

    The Architect

    Document what you're about to build. Perfect for greenfield projects and new feature development where you want compliance baked in from day one.

    Ideal for:
    • New product development
    • Major feature additions
    • Regulated system migrations

    Retrospective Mode

    The Archaeologist

    Document what you've already built. Ideal for legacy systems, acquired codebases, or projects that grew faster than their documentation.

    Ideal for:
    • Legacy system validation
    • Post-acquisition compliance
    • Audit remediation

    Built for Compliance

    SDC speaks the language of your regulators—across industries.

    FDA 21 CFR Part 11 / GAMP 5 / CSA
    Pharmaceutical & Life Sciences
    Automated electronic records with complete audit trails
    IEC 62304
    Medical Devices
    Software lifecycle documentation for SaMD/SiMD
    SOX
    Financial Services
    Internal controls documentation for financial systems
    DO-178C
    Aerospace
    Airborne software verification evidence packages
    ISO 26262 / ASPICE
    Automotive
    Functional safety documentation for vehicle systems

    AI Speed, Human Assurance

    We understand the concerns around AI in regulated environments. That's why every SDC deployment includes expert oversight. Our consultants review, verify, and sign off on all generated artifacts—giving you the speed of automation with the safety of human judgment.

    100%Artifacts Reviewed
    0Unverified Deliverables
    20+Years Expert Oversight

    Want This Speed on Your Next Project?

    We deploy SDC as part of our managed validation services. Get the full power of our technology with expert implementation.

    Hire Us to Deploy SDC

    Building an Internal Validation Team?

    We're preparing SDC for standalone enterprise release. Sign up for early access and be the first to know.

    Ready to Achieve Compliance Excellence?

    Whether you're facing an audit, implementing new systems, or building AI solutions for regulated environments—we're here to help.

    Free initial consultation • No obligation • DACH, UAE and USA focused